Back to all

Utility account connection flow for Public Grid

Public Grid Flows

Let’s talk
Utility account connection flow for Public Grid

Every state of connecting a utility account to Public Grid, shown here with National Grid.

It starts with the utility login and a note that credentials are protected and never stored, with Upload bill as a way out for anyone without an online account. A verification code comes next, then a progress list while Public Grid connects, validates the credentials and pulls in the account details. It ends with You’re connected and the linked account.

The failures get the same care: a wrong password offers Try again or Upload bill, and an incomplete code gets an inline error and a resend link.

Got something real to build?

I join your team as a design partner and stay for the long run, from the first flow to shipped UI.

Let’s talk